Shower remodel costs in Indianapolis depend mostly on wall material (tile vs acrylic) and glass enclosure choice. Most projects fall between $6,500 and $25,000.

What drives the price

The two biggest cost variables are wall material and glass enclosure. Acrylic shower systems install in one to three days and never need grout. Custom tile showers feel more upscale but take seven to twelve days and require waterproofing, mortar, and grout work.

Glass adds significant cost. Frameless glass is thicker (3/8 inch typical) and requires precise templating. Framed and semi-frameless glass uses thinner glass and simpler hardware.

Local cost factors

Older Indianapolis showers often have cast iron drains and galvanized supply lines that may need updating. Replacing the shower valve while the wall is open is standard practice and is included in most quotes. Curbless shower entries require lowering the subfloor or building up the surrounding floor, which adds labor.

Realistic price ranges

Below are typical Indianapolis shower remodel ranges by scope.

ScopeTypical Range
Acrylic shower system replacement$6,500 - $12,000
Tile shower with framed glass$9,500 - $18,000
Tile shower with frameless glass$14,000 - $25,000
Curbless tile shower with linear drain$16,000 - $30,000+

Ranges shown are typical for the Indianapolis market. Final pricing varies based on scope, materials, site conditions, and provider. An in-home estimate produces a written quote.

Final pricing varies by wall material, glass enclosure, valve replacement, and any drain or framing work needed. A free in-home estimate produces a written quote.

Common Questions

Tile or acrylic, which is cheaper?

Acrylic is typically less expensive on a same-footprint replacement and installs in one to three days. Tile is usually $3,000 to $7,000 more but produces a more upscale look.

Why is frameless glass more expensive?

Frameless glass uses thicker (3/8 inch) tempered glass and requires precise templating and hardware. The material and labor are both higher than framed or semi-frameless options.

How long is the bathroom unusable?

Acrylic systems take one to three days. Tile showers take seven to twelve days plus glass templating lead time of about two weeks.